Josefine_Günschel_Homepage Water works  
 
 
works
interior
water works | back and forth:waiting | steel bands | ziezow | line up | plüschow | courtyard cellar | columns

exterior

vita
contact
links
 
Water works  
 
1 | 2 | 3 | 4   next
 
Kinetic installation, 2002
Swimming pool, Oderberger St., Berlin

Domestic sprinklers, hoses, plexiglass, suspension springs

Photographs: Jens Komossa


The swimming pool in Oderberger Street was designed and built by Ludwig Hoffmann between 1897-1902. It boasts an opulent, main swimming hall and served as a washing and swimming centre for the citizens of Prenzlauer Berg. The pool was closed in 1986 as cracks developed in the main hall and the swimming pool itself. The washing areas and sauna remained opened until 1997, after which the building was closed.



deutsch